List of 2 sets of 6 ton gas steam boiler host and auxiliary equipment
2023-07-10
item number | item name | manufacturer name | Specifications | quantity | unit | The final destination specified in the Bid Data Sheet (project site) | Arrival date (as defined by the International Chamber of Commerce Incoterms) | ||
Earliest Arrival Date | latest arrival date | Bidder's arrival date [to be filled in by the bidder] | |||||||
one, | The main material of the process part | ||||||||
1 | gas steam boiler | 6t, rated air supply pressure 1.0MPa, including burner, NOx<30mg/m3 | 2 | tower | 25 days after signing the contract | 45 days after signing the contract | |||
1-1 | Flue gas condenser | Supporting 6t boiler | 2 | tower | 25 days after signing the contract | 45 days after signing the contract | |||
1-2 | Boiler supporting sound insulation cover | Supporting 6t boiler | 2 | set | 25 days after signing the contract | 45 days after signing the contract | |||
1-3 | boiler feed pump | Supporting 6t boiler | 4 | tower | 25 days after signing the contract | 45 days after signing the contract | |||
1-4 | Smoke cooling circulation pump | Supporting 6t boiler | 2 | tower | 25 days after signing the contract | 45 days after signing the contract | |||
2 | Continuous Blowdown Expander | LP-0.75 | 1 | tower | 25 days after signing the contract | 45 days after signing the contract | |||
3 | Boiler Sample Cooler | Φ273 | 2 | tower | 25 days after signing the contract | 45 days after signing the contract | |||
4 | Heat exchange unit | Total heat exchange 0.28MW | 1 | set | 25 days after signing the contract | 45 days after signing the contract | |||
4-1 | Plate heat exchanger | The heat exchange capacity of a single unit is 0.20MW, the pressure of the equipment is 1.0MPa, and a single unit bears 70% of the heat load | 2 | tower | 25 days after signing the contract | 45 days after signing the contract | |||
4-2 | Circulating water pump for heat exchange system | Q=15m3/h, H=32mH2O P=9kW, frequency conversion | 2 | tower | 25 days after signing the contract | 45 days after signing the contract | |||
4-3 | Make-up water pump for heat exchange system | Q=1m3/h, H=32mH2O P=0.37kW, frequency conversion | 2 | tower | 25 days after signing the contract | 45 days after signing the contract | |||
5 | Vertical decontamination device | DN80 PN10, straight type | 2 | tower | 25 days after signing the contract | 45 days after signing the contract | |||
6 | butterfly valve | DN80 PN16 D341H-16 | 4 | indivual | 25 days after signing the contract | 45 days after signing the contract | |||
7 | Flange check valve | DN100 PN16 H44H-16C | 1 | indivual | 25 days after signing the contract | 45 days after signing the contract | |||
DN40 PN16 H44H-16C | 2 | indivual | 25 days after signing the contract | 45 days after signing the contract | |||||
8 | Flange globe valve | DN125 PN16 J41H-16C | 1 | indivual | 25 days after signing the contract | 45 days after signing the contract | |||
DN100 PN16 J41H-16C | 1 | indivual | 25 days after signing the contract | 45 days after signing the contract | |||||
DN80 PN16 J41H-16C | 3 | indivual | 25 days after signing the contract | 45 days after signing the contract | |||||
DN65 PN16 J41H-16C | 2 | indivual | 25 days after signing the contract | 45 days after signing the contract | |||||
DN50 PN16 J41H-16C | 4 | indivual | 25 days after signing the contract | 45 days after signing the contract | |||||
DN40 PN16 J41H-16C | 4 | indivual | 25 days after signing the contract | 45 days after signing the contract | |||||
DN25 PN16 J41H-16C | 3 | indivual | 25 days after signing the contract | 45 days after signing the contract | |||||
DN15 PN16 J41H-16C | 8 | indivual | 25 days after signing the contract | 45 days after signing the contract | |||||
9 | head size | DN80/DN50 | 4 | indivual | 25 days after signing the contract | 45 days after signing the contract | |||
10 | steam flow meter | DN125 | 2 | indivual | 25 days after signing the contract | 45 days after signing the contract | |||
11 | cold water meter | DN25 | 1 | indivual | 25 days after signing the contract | 45 days after signing the contract | |||
12 | Industrial Bimetallic Thermometer | 0-100°C | 5 | indivual | 25 days after signing the contract | 45 days after signing the contract | |||
13 | Spring Tube Pressure Gauge | 0-1.0MPa | 7 | indivual | 25 days after signing the contract | 45 days after signing the contract | |||
14 | seamless steel pipe | ∅219×6 | 100 | rice | 25 days after signing the contract | 45 days after signing the contract | |||
∅133×4 | 60 | rice | 25 days after signing the contract | 45 days after signing the contract | |||||
∅108×4 | 20 | rice | 25 days after signing the contract | 45 days after signing the contract | |||||
∅89×3.5 | 60 | rice | 25 days after signing the contract | 45 days after signing the contract | |||||
∅76×3.5 | 70 | rice | 25 days after signing the contract | 45 days after signing the contract | |||||
∅45×2.5 | 60 | rice | 25 days after signing the contract | 45 days after signing the contract | |||||
∅38×2.5 | 60 | rice | 25 days after signing the contract | 45 days after signing the contract | |||||
11 | Steel for hangers | 120 | kg | 25 days after signing the contract | 45 days after signing the contract | ||||
12 | Aluminum silicate | 3 | m3 | 25 days after signing the contract | 45 days after signing the contract | ||||
13 | 0.5mm galvanized iron sheet | 60 | m2 | 25 days after signing the contract | 45 days after signing the contract | ||||
14 | floor drain | DN100 | 3 | indivual | 25 days after signing the contract | 45 days after signing the contract | |||
15 | Ductile Iron Pipe | DN100 | 20 | rice | 25 days after signing the contract | 45 days after signing the contract | |||
Process piping installation supporting services | |||||||||
1 | Valve insulation | 1. Insulation material: aluminum silicate 2. Insulation thickness: see design instructions for details 3. Valve specifications: see design drawings for details |
0.6 | m3 | Complete within 10 days after arrival | Completed within 30 days of arrival | |||
2 | Flange insulation | 1. Insulation material: aluminum silicate 2. Insulation thickness: see design instructions for details 3. Flange specifications: see design drawings for details |
0.6 | m3 | Complete within 10 days after arrival | Completed within 30 days of arrival | |||
3 | Weld X-ray inspection | 1. Name: X-ray flaw detection of weld seam 2. Film specification: 80mm*300mm 3. Tube wall thickness: within 16 |
60 | open | Complete within 10 days after arrival | Completed within 30 days of arrival | |||
4 | Pipeline corrosion protection | 1. Rust removal level: St3 very thorough manual and power tool rust removal 2. Brushing (spraying) type: Hongdan epoxy anti-rust paint 3. Brushing (spraying) times, paint film thickness: two times |
150 | m | Complete within 10 days after arrival | Completed within 30 days of arrival | |||
5 | Corrosion protection for general steel structures | 1. Rust removal level: St3 very thorough manual and power tools 2. Brushing (spraying) variety: Hongdan epoxy anti-rust paint 3. Number of brushing (spraying) times, paint film thickness: see design instructions for details |
100 | kg | Complete within 10 days after arrival | Completed within 30 days of arrival | |||
two, | The main material of the flue gas system | ||||||||
1 | Double-layer insulation stainless steel chimney | DN600, height 20m | 2 | seat | 25 days after signing the contract | 45 days after signing the contract | |||
2 | round flue | Inner diameter ∅600 δ=5mm | 4 | m | 25 days after signing the contract | 45 days after signing the contract | |||
3 | 90 elbow | DN600 R=650mm δ=5mm | 2 | indivual | 25 days after signing the contract | 45 days after signing the contract | |||
4 | chimney muffler | DN600 | 2 | tower | 25 days after signing the contract | 45 days after signing the contract | |||
5 | Accident exhaust fan in boiler room | Low-noise DFBP35-11-6.3# explosion-proof axial flow fan, single air volume 9585m3/h | 6 | tower | 25 days after signing the contract | 45 days after signing the contract | |||
6 | Inlet muffler for boiler room | The size is 800×630, and the maximum air volume of a single unit is 7000m3/h | 6 | tower | 25 days after signing the contract | 45 days after signing the contract | |||
three, | Fire Fighting System | ||||||||
1 | Hot-dip galvanized steel pipe | DN100, GB/T3091-2008, steel | 240 | m | 25 days after signing the contract | 45 days after signing the contract | |||
DN65, GB/T3091-2008, steel | 50 | m | 25 days after signing the contract | 45 days after signing the contract | |||||
2 | butterfly valve | DN100, cast iron | 15 | indivual | 25 days after signing the contract | 45 days after signing the contract | |||
3 | Low resistance backflow preventer | DN100, cast iron | 2 | indivual | 25 days after signing the contract | 45 days after signing the contract | |||
4 | Auto exhaust valve | DN25, copper | 2 | indivual | 25 days after signing the contract | 45 days after signing the contract | |||
5 | fire hydrant box | Single bolt type A, steel, including water gun and hose | 15 | set | 25 days after signing the contract | 45 days after signing the contract | |||
For testing, steel, including water gun, hose, fire button, pressure gauge | 1 | set | 25 days after signing the contract | 45 days after signing the contract | |||||
Fire pipe installation supporting services | |||||||||
1 | Pipe oiling | 1. Rust removal level: St2 Thorough manual and power tool rust removal 2. Paint type: anti-rust paint 3. Number of times of brushing, paint film thickness: see design instructions for details |
240 | m | Complete within 10 days after arrival | Completed within 30 days of arrival |
6 ton, gas steam boiler host,auxiliary equipment