How To Process CFB Boiler Furnace Drying

2016-05-13

How To Process CFB Boiler Furnace Drying

In order to ensure the normal operation of CFB Boiler, after its maintenance or long-term operation, it is necessary to process properly furnace drying to get rid of moisture in the furnace, otherwise it might easily lead to furnace wall cracking and deformation. In addition, attentions should be paid to the cleaning of furnace, smoke flue and the fold smoke wall while circulating fluidized bed boiler furnace drying. Here let’s take the 130 ton CFB steam boiler as the example, to see how to process the furnace drying?

Before furnace drying:

Before furnace drying, 130t h circulating fluidized bed boiler doors and ducts should be opened, usually it takes 7 ~ 10 days for the furnace inside natural drying; then put hearth layer of 300~400ram on the air distribution plate, and place the prepared wood in the right center of the air distribution plate material layer (Notice: there shouldn’t be anything non-flammable like nails). Pay attention that the fame cannot approach boiler front and rear furnace wall when the 130 ton CFB Boiler processes furnace drying, and the drying temperature should be no higher than 50℃ on the first day.

While furnace drying:

cfb boiler diagram

When the combustion chamber temperature rose to a certain temperature and ventilation  gravity has increased, 130 t / h circulating fluidized bed boiler should turn down its flue baffle or Induced draft fan air shutter. During furnace drying process, timely add water whenever water shortage, and keep the water level always at the normal water level line.  Stable combustion of the wood material is also important for successful drying, if necessary, start the air fan to supply proper amount of air. 

130 ton CFB Boiler Main Parameter:

Rated steam capacity:130 t/h
Rated steam temperature: 450 ℃
Rated steam pressure: 3.82 MPa
Feeding water temperature:105 ℃
Flue gas temperature:134 ℃
Pollution discharge efficiency: ≤2 %
Boiler design thermal efficiency: 87.1 %

How To Process CFB Boiler Furnace Drying, 130 ton CFB Boiler furnace drying proc

HOT PRODUCT

HOW TO CONTACT

Chat Online

If you are interested in our products, please feel free to contact us now! Click and chat online.

chatOnline
  • Heat Converters
  • Pressure Converters
  • Temperature Converters

Any question, please contact us for free. Phone number: +86-371-86686767 Skype: zgboiler Email:zbgboiler@zzboiler.com

KW
bar
    °C