12.8t/h Sintering Machine Waste Heat Boiler Project and Its Technical Parameters

2023-10-19

 320m2 sintering area of ​​iron and steel plant with 12.8 tons sintering machine waste heat boiler project

1. Meteorological conditions

2. Sintering Process System Parameters

Table 1 Design parameters of main equipment of 320m2 sintering machine

project unit parameter Remark
Sintering Machine Effective area 324  
quantity tower 1  
Number of working days d/a ≥330  
Utilization factor t/(m2.h) ≥1.15  

Table 2 Parameters of hot air resources used by the large flue of 320m2 sintering machine

Operating conditions 17# 18# 19# 20# twenty one# Average temperature (°C)
Minimum (°C) 385 365 425 405 395 395
Normal (°C) 400 420 440 420 410 410
Maximum (°C) 415 435 455 435 425 425
The flow rate of each dust control branch pipe m3/h
Operating conditions 17# 18# 19# 20# twenty one# total
Single flue branch flow 39750 39750 39750 39750 39750 198750
Double flue branch pipe flow 79500 79500 79500 79500 79500 397500

3. Main design parameters of waste heat recovery device:

serial number project unit value
1 superheated steam pressure MPa 1.6 (gauge pressure)
2 superheated steam temperature 320
3 Rated evaporation t/h 12.8 (factory accounting)
4 Feed water temperature 151
5 Exhaust gas volume Nm3/h 170000 (factory accounting)
6 Flue gas side resistance loss Pa ≤350
7 boiler efficiency % (factory accounting)
8 Boiler evaporation area m2 (factory accounting)
9 Exhaust smoke temperature after waste heat recovery in large flue ≥125

Get An Instant Quotation

For all inquiries, please fill in the form below (* are required) to send us a brief message, and we will get back to you as soon as possible.


  • Heat Converters
  • Pressure Converters
  • Temperature Converters

Any question, please contact us for free. Phone number: +86-371-86686767 Skype: zgboiler Email:zbgboiler@zzboiler.com

KW
bar
    °C