Analysis the boiler tonnage in aac plant
ZG has more than 20 aerated concrete production line equipments , whose output size arrange from 20000 cubic to 30 million cubic meters. Its scale equipment program is very complex, and a device for producing standard boiler line is an essential. For different production scale aerated concrete block production line , the auxiliary boiler equipment demands is not the same.
How to choose different size equipment according annual output of different aerated concrete block production line, ZG comes up with the analysis:
Standard configuration: for the annual output of 2-5 million cubic meters of aerated block production line equipment, an autoclave, a 4 ton boiler are needed.
Standard two: for the annual output of 5-8 million cubic meters of aerated block production line, two φ 2 × 21m autoclave, a 4 ton boiler are needed.
Standard three: for the annual output of 100000 cubic aerated block production line equipment, four φ 2 × 31m autoclave, a 4 ton boiler are ok .
Standard four: for the annual output of 150000 cubic aerated block production line, six φ 2 × 31m autoclave, a 6 ton boiler are ok.
Standard five: for the annual output of 200000 cubic aerated block production line, six Φ 2.68 × 31.5m autoclave, a 8 ton boiler are needed.
Standard six: for the annual output of 300000 cubic aerated block production line, eight Φ 2.68 × 31.5m autoclave, three sets of 4 ton boiler are needed.
The above six kinds of configuration can probably meet the use of aerated concrete equipment manufacturers of different needs for different production aerated block production line equipment.