How To Save Energy For Cement Plant
Energy saving and environmental protection are one of the main task of industries in recent years, so for cement plant, a large energy cost industry, how to save cost and decrease waste is directly affect the profit of itself. Energy saving for cement plant can be started with a higher efficiency steam boiler for cement plant, waste heat recovery unit for cement plant, power generating system update, dust remove system upgrade, etc.
Energy saving with a high efficiency steam boiler
Large quantity of high temperature steam is needed during the cement production process, so an energy saving steam boiler is the main equipment that can save cost. With a large capacity of 10-280 ton per hour steam, circulating fluidized bed steam boiler or cfb steam boiler, has a higher efficiency. The cfb steam boiler burning in circulating fluidized bed type, can burn both coal and biomass fuel and a fully combustion of fuel and a continue heat supply for production is guaranteed. So the cfb steam boiler is the largest, most energy saving equipment. The most important is that it can meet almost all the different need of customs, so it is widely used in cement plants.
Waste heat recovery unit for cement plant
During the production process, a lot of waste heat will be generated and so takes away part of heat energy. With a waste heat recovery unit, the waste heat could be collected and reused for heating or generating power. The cement kiln waste boiler is small size, low steel consumption and less air leakage. Three types of high temperature, medium temperature and low temperature could meet the different types and specifications of lime kiln, producing process and equipment, which is applied to the cement industry with the capacity of 100t ~ 10000t per day.
With these equipment, we can save fuel cost and reuse the waste heat in production process and generating power, which can save a lot cost for industry and decrease pollution.